3 days ago
Prokop Svoboda Attended the PULSE Ostrava 2025 Conference
The second international festival of architecture and design organized by the PULSE platform was held in the middle of May in the industrial premises of Dolní Vítkovice....

10.10.2021
The rough construction of the Fragment residential project is continuing according to schedule. The reinforced concrete structure has now reached the sixth floor and the fragmented look of its repeating blocks is gradually being revealed. Up to now, it could only be seen in the project’s visualizations.
“An important element that we have been following very closely in recent weeks is the construction of the residential bridge that will connect the two wings of the building at the point in which they turn away from each other. This is a major challenge in terms of structural engineering, but it allows us to create apartments with truly unique interiors,” says Marcel Soural, chairman of the board of Trigema.
At the beginning of October, work began on the HVAC system and drywall partitions, and so the layouts of the individual apartments are starting to take shape. The relocation of the hot water pipes and sewerage lines for the building was completed. Rough construction is planned to be finished in Q1 2022.
More information about the Fragment project.
3 days ago
The second international festival of architecture and design organized by the PULSE platform was held in the middle of May in the industrial premises of Dolní Vítkovice....
1 week ago
Views of Bratislava’s castle and privately exhibited artworks, this was what guests enjoyed most at the grand opening of the new offices of Svoboda & Williams’ Slovak bra...