2 weeks ago
Market Report H2 2025: The Market Is Seeking a New Normal
In the second half of 2025, we saw real estate prices grow. However, property sizes are decreasing, both in terms of owned and rented, but the latter in particular. These...
10.10.2021
The rough construction of the Fragment residential project is continuing according to schedule. The reinforced concrete structure has now reached the sixth floor and the fragmented look of its repeating blocks is gradually being revealed. Up to now, it could only be seen in the project’s visualizations.
“An important element that we have been following very closely in recent weeks is the construction of the residential bridge that will connect the two wings of the building at the point in which they turn away from each other. This is a major challenge in terms of structural engineering, but it allows us to create apartments with truly unique interiors,” says Marcel Soural, chairman of the board of Trigema.
At the beginning of October, work began on the HVAC system and drywall partitions, and so the layouts of the individual apartments are starting to take shape. The relocation of the hot water pipes and sewerage lines for the building was completed. Rough construction is planned to be finished in Q1 2022.
More information about the Fragment project.
2 weeks ago
In the second half of 2025, we saw real estate prices grow. However, property sizes are decreasing, both in terms of owned and rented, but the latter in particular. These...
2 weeks ago
The Slunečná & Slovanka residential project, offering a total of 24 apartments designed for permanent or holiday living, is emerging in the highest elevated town in Bohem...